(1)
Luthfan, A.; Rachmawati, F. A Quantitative Analysis of Cost, Time, and Construction Risk of Underground Construction Methods for A Lifting Pump Station in A Constrained Site: A Case Study of the Jakarta Sewerage Development Project (JSDP) Zone 1 Package 1. jrssem 2026, 6, 684-698.