[1]
A. Luthfan and F. Rachmawati, “A Quantitative Analysis of Cost, Time, and Construction Risk of Underground Construction Methods for A Lifting Pump Station in A Constrained Site: A Case Study of the Jakarta Sewerage Development Project (JSDP) Zone 1 Package 1”, jrssem, vol. 6, no. 1, pp. 684–698, Aug. 2026.